Christmas home 1.5 meter wall hanging battery operated LED string light for wedding and Christmas

FOB Reference Price:Get Latest Price
$1.25 - $2.95 / Piece | 100 Piece/Pieces (Min. Order)
Emitting Color:
Warm White
Shipping:
Support Sea freight
Lead Time:
Quantity(Pieces) 1 - 1000 >1000
Est. Time(days) 20 Negotiable
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
Flymy
Length:
1.5meter, 1.1m10 lights / 2.2m 20 lights
Holiday Name:
Christmas
Input Voltage(V):
3V
Name:
led decoration light
Certificate:
CE&ROHS
Time:
50hours
Power:
3AA batteries( not included)
Material:
Iron
Color of LED:
warm white
Shape:
heart, ball, lantern,tree,customized
Function:
Christmas tree, home decor,festival
Folded:
Yes
Supply Ability
Supply Ability:
50000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
1pc/ opp bag, 50 opp bags/ cartion
Port
Ningbo/ Shanghai
Lead Time :
Quantity(Pieces) 1 - 1000 >1000
Est. Time(days) 20 To be negotiated
Product Description

CE&ROHS Alibaba Christmas home decoration LED string light

Item: led decoration light

LED color: white, blue, red, warm white, purple,RGB, customized

Bulb: F5 LED

Voltage: 4.5V

Bulb distance: 10cm

Length: 1.1m with 10 lights / 2.2m with 20 lights

Work time: 50hours

Power: 3AA batteries (not included)

Place of origin: China (mainland), Zhejiang

 

 

Packaging & Shipping

 

Packaging Details for led decoration light:

1pc/ opp bag, 50 opp bags/ carton

Delivery Detail:7-15 days

Port: Ningbo / Shanghai

Delivery:by air, by sea,by DHL,FEDEX,UPS,TNT,etc.

Payment Term:

T/T(30% in advance, the balance be paid before delivery),Paypal,Western Union,L/C,etc.

 

Company Information

 

FAQ

 Q1.Can I have a sample order for LED string light?

 A: Yes, we welcome sample order to test and sample orders are acceptable.

 

Q2.What about the lead time?

 A: Need about 7 days, mass production time needs 1-2 weeks.

 

Q3.Do you hava any MOQ limit for Christmas led light order?

 A: Low MOQ, 1pc is available for sample.

 

Q4.How do you ship the goods and how long will it take to arrive?

 A: We usually ship by sea,by air,by DHL,UPS,FedEx or TNT. It  usually take 1 week to arrive.

 

Q5. How to proceed an order for Christmas led light?

A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.